Fruits of your contribution 2023-2025
2023 Finished Projects:
- Tree Removal & Trimming
- South Exit Driveway Repair
- Electrical Outlets on the West Side of the School for Festival Use
- New Sound System in Church
- Mulching and edging for all Landscaping
- Organ Cleaned and Repaired
2024 FINISHED PROJECTS:
- Ductwork to the unit heaters in the gym was cleaned
- Sump pump replaced in Rectory
- DeSimone A/C repair
- Parking lot repaired by the school breezeway entrance
- Replaced a bad drain in the school cafeteria
- The front doors of the church were re-stained
- Bell tower lights were replaced
- Burned-out parking lot lights were replaced
- The stage floor in the school was refinished
2025 FINISHED PROJECTS:
- Lower-level Rectory toilet replaced
- Parking lot re-striped
- Rectory electrical panel replaced
- New battery for the elevator emergency light
- Replaced 4 parking lot lights and 2 fixtures
- Installed electricity for the outside Nativity scene
- Dehumidifier added in convent basement
- Soundproofing panels were added to the gym
- All school thermostats were calibrated
- Wi-Fi Assist hearing installed in the church
- School entry door #2 was replaced
*Some projects were funded by insurance or a third party